How Long Does a Bathroom Remodel Actually Take?

One of the most common questions homeowners ask before starting a renovation is: “How long does a bathroom remodel actually take?” Understanding the timeline helps you plan around disruptions, coordinate with contractors, and set realistic expectations. In this guide, we break down the phases of a bathroom remodel and explain what affects the schedule so you’re prepared for your Ramsey, MN project with Halloran Brothers.

Typical Bathroom Remodel Timeline

The length of a bathroom remodel depends on the scope of work, materials chosen, permitting requirements, and the condition of existing plumbing and structure. Below is a typical timeline many homeowners experience:

Bathroom Remodel Phase Estimated Time
Planning & Design 1–2 weeks
Permitting (if required) 1–3 weeks
Demolition 1–2 days
Rough-In Plumbing & Electrical 2–4 days
Structural Changes 1–3 days
Installation of Fixtures & Cabinets 3–7 days
Tile, Flooring & Shower Work 3–7 days
Painting & Trim 1–3 days
Final Inspection & Cleanup 1–2 days
Average Total Time 3–8 weeks

1. Planning & Design (1–2 Weeks)

Before construction begins, a successful remodel starts with planning. During this phase:

  • You select layouts, materials, tiles, fixtures, vanities, and lighting
  • Halloran Brothers helps finalize design details
  • Plans are drafted for contractor use or permitting submission

Good planning minimizes change orders that can delay your project later.

2. Permitting (1–3 Weeks)

Some bathroom remodels need building permits — especially if you’re:

  • Moving plumbing locations
  • Changing electrical layouts
  • Altering the bathroom footprint

Permitting timelines vary by city (like Ramsey, Albertville, or surrounding areas), so it’s good to get applications in early.

3. Demolition (1–2 Days)

Demolition clears out your old fixtures, flooring, cabinets, and possibly walls. A professional crew works quickly and safely — minimizing dust and protecting your home.

4. Rough-In Plumbing & Electrical (2–4 Days)

Once walls and floors are cleared, licensed professionals install plumbing and wiring. This phase:

  • Moves drains, vents, and supply lines
  • Installs wiring for lighting, outlets, and ventilation fans

Quality rough-in work prevents future issues and ensures code compliance.

5. Structural Changes (1–3 Days)

If your remodel includes enlarging the shower, moving walls, or reframing, this step follows rough-in. Structural work can add time but is essential for layout changes.

renovated bathroom with white shower tile - Halloran Brothers bathroom remodel6. Installation of Fixtures & Cabinets (3–7 Days)

With infrastructure in place, installers add:

  • Cabinets and vanities
  • Sinks and faucets
  • Toilet and hardware
  • Shower doors and built-ins

Custom cabinetry or special-order items can affect timing.

7. Tile, Flooring & Shower Work (3–7 Days)

This phase often takes the longest:

  • Laying tile floors and walls
  • Grouting and sealing
  • Installing glass enclosures

Proper drying time is crucial to prevent future cracking or moisture issues.

8. Painting & Trim (1–3 Days)

Painting walls and ceilings, installing baseboards and trim, and finishing touches make your bathroom feel complete.

9. Final Inspection & Cleanup (1–2 Days)

A final walkthrough confirms fixtures, finishes, and safety — ensuring your space is move-in ready. Halloran Brothers handles cleanup and final punch list details.

What Can Affect Your Remodel Timeline?

Scope of Work

A simple cosmetic update finishes faster than a full gut remodel with layout changes.

Material Lead Times

Custom vanities, specialty tiles, and fixtures with long lead times can extend your schedule.

Inspection Delays

Municipal inspections are necessary for code compliance — but scheduling delays can happen.

Structural & Hidden Issues

Old plumbing, rot, mold, or framing problems discovered during demolition can add time.

Frequently Asked Questions

Q: Can a bathroom remodel be completed in less than a month?

A: Yes — smaller updates without plumbing or electrical changes can be done in about 2–4 weeks.

Q: Do I need to move out during a bathroom remodel?

A: Not usually. Most homeowners stay in their homes, but plan to use alternate bathrooms if available.

Q: How soon can I use my new bathroom after completion?

A: Once flooring, grouting, and seals are fully cured — typically within a day or two after final installation.

Q: Should I expect surprises during a remodel?

A: Sometimes. A professional contractor like Halloran Brothers anticipates issues and communicates them early to minimize delays.

If you’re planning a bathroom remodel in Ramsey, MN, Halloran Brothers can help you understand realistic timelines, plan effectively, and complete your renovation with quality craftsmanship. Contact us today to start your project!